Runway
The rails, beams and columns on which the crane operates. The
rail, on which the endtrucks run, is fastened to the runway beam. This beam is then supported on columns (Top Running) or from
the roof structure (Under Running). The existing building columns
can be used or new ones can be supplied with the system. New
columns can either be completely Free Standing or Tied Back to
the existing building structure for additional lateral support. When
designing a runway system that is to use existing building columns,
it is important to provide the down shop center to center spacing
between them. Conductors supply power to the crane and are
mounted on the runway beam. |
|
|